<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>VCF on iThinkVirtual™</title><link>https://ithinkvirtual.com/tags/vcf/</link><description>Recent content in VCF on iThinkVirtual™</description><generator>Hugo</generator><language>en-us</language><lastBuildDate>Fri, 30 Oct 2026 07:30:00 -0400</lastBuildDate><atom:link href="https://ithinkvirtual.com/tags/vcf/index.xml" rel="self" type="application/rss+xml"/><item><title>Applying the Interim Brotli CVE Workaround on SDDC Manager 9.1.1</title><link>https://ithinkvirtual.com/posts/sddc-manager-brotli-cve-2026-111497-workaround/</link><pubDate>Fri, 30 Oct 2026 07:30:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/sddc-manager-brotli-cve-2026-111497-workaround/</guid><description>&lt;p&gt;Broadcom has a manual interim workaround for a critical Brotli vulnerability in SDDC Manager 9.1.1. It&amp;rsquo;s all done at a shell, with edits to two files. This post walks through it on my SDDC Manager 9.1.1 lab, from the backups to the verification tests and the rollback.&lt;/p&gt;</description></item><item><title>Patching VMware Cloud Foundation 9.1.1, Part 2: NSX, vCenter, and ESX</title><link>https://ithinkvirtual.com/posts/vcf-9-1-1-patch-part-2-core-components/</link><pubDate>Mon, 19 Oct 2026 23:09:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-1-patch-part-2-core-components/</guid><description>&lt;p&gt;&lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-1-patch-part-1-management-components/"&gt;Part 1&lt;/a&gt; covered the management plane. This part moves on to the core components.&lt;/p&gt;
&lt;aside class="tested-on"&gt;&lt;strong&gt;Tested on&lt;/strong&gt;&lt;dl&gt;&lt;div&gt;&lt;dt&gt;Environment&lt;/dt&gt;&lt;dd&gt;Nested VCF 9.1.1 lab&lt;/dd&gt;&lt;/div&gt;&lt;div&gt;&lt;dt&gt;Depot&lt;/dt&gt;&lt;dd&gt;Offline, VCF Download Tool&lt;/dd&gt;&lt;/div&gt;&lt;div&gt;&lt;dt&gt;Covers&lt;/dt&gt;&lt;dd&gt;NSX Manager, vCenter, ESX, NSX Edge and finalize, in both domains&lt;/dd&gt;&lt;/div&gt;&lt;/dl&gt;&lt;/aside&gt;
&lt;h2 id="planning-the-component-upgrade"&gt;Planning the component upgrade&lt;/h2&gt;
&lt;p&gt;I planned NSX Manager, vCenter, and ESX in the same component upgrade plan as SDDC Manager in &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-1-patch-part-1-management-components/"&gt;Part 1&lt;/a&gt;, so there was nothing to plan again for the management domain.&lt;/p&gt;</description></item><item><title>Patching VMware Cloud Foundation 9.1.1, Part 1: Management Components</title><link>https://ithinkvirtual.com/posts/vcf-9-1-1-patch-part-1-management-components/</link><pubDate>Mon, 19 Oct 2026 23:08:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-1-patch-part-1-management-components/</guid><description>&lt;p&gt;In the &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-1-patch-series-overview/"&gt;series overview&lt;/a&gt; I covered what&amp;rsquo;s in the October 12th patch set and the caveats to know first. This part patches the management plane.&lt;/p&gt;
&lt;aside class="tested-on"&gt;&lt;strong&gt;Tested on&lt;/strong&gt;&lt;dl&gt;&lt;div&gt;&lt;dt&gt;Environment&lt;/dt&gt;&lt;dd&gt;Nested VCF 9.1.1 lab&lt;/dd&gt;&lt;/div&gt;&lt;div&gt;&lt;dt&gt;Depot&lt;/dt&gt;&lt;dd&gt;Offline, VCF Download Tool&lt;/dd&gt;&lt;/div&gt;&lt;div&gt;&lt;dt&gt;Covers&lt;/dt&gt;&lt;dd&gt;Fleet Lifecycle, SDDC Manager, VCF management components&lt;/dd&gt;&lt;/div&gt;&lt;/dl&gt;&lt;/aside&gt;
&lt;h2 id="patch-binaries"&gt;Patch binaries&lt;/h2&gt;
&lt;p&gt;On the instance&amp;rsquo;s &lt;strong&gt;Binary Management&lt;/strong&gt; tab, &lt;strong&gt;Patch binaries&lt;/strong&gt; for VCF version 9.1 lists five patches, and I downloaded the vCenter, SDDC Manager, NSX, and ESX ones before planning anything.&lt;/p&gt;</description></item><item><title>Patching VMware Cloud Foundation 9.1.1: Series Overview</title><link>https://ithinkvirtual.com/posts/vcf-9-1-1-patch-series-overview/</link><pubDate>Mon, 19 Oct 2026 23:07:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-1-patch-series-overview/</guid><description>&lt;p&gt;On October 12th, Broadcom published a new round of patches for VCF 9.1.1 components. This series applies them to the lab I &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/"&gt;upgraded from 9.0.2 to 9.1.1&lt;/a&gt;, in the order the documentation gives, using the upgrade planner where it applies. This post covers what&amp;rsquo;s in the patch set, the caveats to know first, and how the series is laid out.&lt;/p&gt;</description></item><item><title>VCF 9.1 Readiness Gates: What Held Up and What Didn't</title><link>https://ithinkvirtual.com/posts/vcf-9-1-readiness-gates-lessons-learned/</link><pubDate>Tue, 13 Oct 2026 20:30:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-readiness-gates-lessons-learned/</guid><description>&lt;p&gt;Before I started the &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/"&gt;upgrade series&lt;/a&gt;, I wrote down &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-readiness-five-gates/"&gt;five readiness gates&lt;/a&gt; I&amp;rsquo;d want in front of anyone booking a window for a 9.0.x to 9.1.x upgrade. Now that I&amp;rsquo;ve run the whole thing end to end, here&amp;rsquo;s what held up and what didn&amp;rsquo;t. This is a nested lab, not production, so read it as a rehearsal and not as evidence.&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Part 6: Post-Upgrade Housekeeping and the Workload Domain</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-6-housekeeping-workload-domain/</link><pubDate>Mon, 12 Oct 2026 23:45:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-6-housekeeping-workload-domain/</guid><description>&lt;p&gt;With the management domain upgraded in Parts &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-1-vcf-operations/"&gt;1&lt;/a&gt; to &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-5-esxi-nsx-edge/"&gt;5&lt;/a&gt;, this final part covers the cleanup tasks that round out the upgrade, and then the workload domain. (As always, the &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/"&gt;series overview&lt;/a&gt; has the environment and prerequisites if you need them.)&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Part 5: ESX Hosts and Completing the NSX Upgrade</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-5-esxi-nsx-edge/</link><pubDate>Sat, 10 Oct 2026 15:00:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-5-esxi-nsx-edge/</guid><description>&lt;p&gt;With NSX Manager and vCenter upgraded in &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-4-nsx-vcenter/"&gt;Part 4&lt;/a&gt;, it&amp;rsquo;s time for the hosts. Part 5 covers the &lt;strong&gt;ESX host upgrade&lt;/strong&gt; with vLCM image-based remediation, and then &lt;strong&gt;completing the NSX upgrade&lt;/strong&gt;. My management domain doesn&amp;rsquo;t have an NSX Edge cluster. The Edges in my lab live in the workload domain, and they get their turn in &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-6-housekeeping-workload-domain/"&gt;Part 6&lt;/a&gt;.&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Part 4: NSX and vCenter</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-4-nsx-vcenter/</link><pubDate>Wed, 07 Oct 2026 20:00:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-4-nsx-vcenter/</guid><description>&lt;p&gt;With the management components handled in Parts &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-1-vcf-operations/"&gt;1&lt;/a&gt; to &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-3-automation-logs/"&gt;3&lt;/a&gt;, Part 4 moves to the core infrastructure: &lt;strong&gt;NSX Manager&lt;/strong&gt; and &lt;strong&gt;vCenter&lt;/strong&gt;. The &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/"&gt;series overview&lt;/a&gt; has the environment details and prerequisites.&lt;/p&gt;
&lt;p&gt;Everything here is driven from the VCF Operations Lifecycle UI, the same place I&amp;rsquo;ve worked since &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-2-sddc-manager-management-services/"&gt;Part 2&lt;/a&gt;. Broadcom&amp;rsquo;s flow is to plan the domain upgrade, run the prechecks, then work through the sequence one component at a time, NSX Manager first and then vCenter (&lt;a href="https://techdocs.broadcom.com/us/en/vmware-cis/vcf/vcf-9-0-and-later/9-1/deployment/upgrading-cloud-foundation/upgrade-the-management-domain-to-vmware-cloud-foundation-5-2/updating-vcenter-and-nsx.html"&gt;Upgrading vCenter and NSX Manager&lt;/a&gt;).&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Part 3: VCF Automation and Operations for Logs</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-3-automation-logs/</link><pubDate>Tue, 06 Oct 2026 14:00:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-3-automation-logs/</guid><description>&lt;p&gt;With SDDC Manager and the new VCF Management Services runtime in place after &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-2-sddc-manager-management-services/"&gt;Part 2&lt;/a&gt;, Part 3 tackles two more components: &lt;strong&gt;VCF Automation&lt;/strong&gt; and &lt;strong&gt;VCF Operations for Logs&lt;/strong&gt;.&lt;/p&gt;
&lt;p&gt;These two matter for a reason beyond just version numbers. As the &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/"&gt;series overview&lt;/a&gt; explains, the cert and password freeze window kicked in the moment I upgraded VCF Operations back in &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-1-vcf-operations/"&gt;Part 1&lt;/a&gt;. VCF Automation and Logs are two of the four components stuck behind that freeze (the Identity Broker and VCF Operations for Networks are the others), so getting them to 9.1 lifts it for them.&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Part 2: SDDC Manager and VCF Management Services</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-2-sddc-manager-management-services/</link><pubDate>Mon, 05 Oct 2026 11:00:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-2-sddc-manager-management-services/</guid><description>&lt;p&gt;In &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-1-vcf-operations/"&gt;Part 1&lt;/a&gt; I upgraded VCF Operations to 9.1, watched the old Fleet Management appliance decommission itself, and let the Cloud Proxy auto-upgrade along the way. With the operations layer on 9.1, next up is SDDC Manager and the new management services.&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Part 1: Upgrading VCF Operations</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-1-vcf-operations/</link><pubDate>Thu, 01 Oct 2026 13:00:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-part-1-vcf-operations/</guid><description>&lt;p&gt;This is Part 1 of my VMware Cloud Foundation 9.0.2 to 9.1 upgrade series. The &lt;a href="https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/"&gt;series overview&lt;/a&gt; covers my lab environment, what&amp;rsquo;s changing in 9.1, the prerequisites that gate the whole upgrade, and a cert and password warning that applies from this stage on. With that prep done, I started with the operations layer.&lt;/p&gt;</description></item><item><title>VMware Cloud Foundation 9.1 Upgrade - Series Overview and Planning</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/</link><pubDate>Wed, 30 Sep 2026 12:45:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-series-overview/</guid><description>&lt;p&gt;VMware Cloud Foundation 9.1 dropped on May 12th, and since most of my focus these days lives squarely in the VCF world, I figured there&amp;rsquo;s no better way to put it through its paces than to upgrade my own lab from 9.0.2 and document the whole thing along the way.&lt;/p&gt;</description></item><item><title>Before You Upgrade to VCF 9.1.x: Five Readiness Gates</title><link>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-readiness-five-gates/</link><pubDate>Tue, 29 Sep 2026 12:00:00 -0400</pubDate><guid>https://ithinkvirtual.com/posts/vcf-9-1-upgrade-readiness-five-gates/</guid><description>&lt;p&gt;VCF 9.1.1 has been out since September 3rd, and the 9.1.1.0100 patches for fleet lifecycle and SDDC lifecycle landed on the 21st, so the upgrade guidance has finally settled enough to plan against. Downloading the binaries is the easy part. The hard part is being able to say exactly what will change, why the path is supported, and how you&amp;rsquo;ll know the environment is healthy afterward.&lt;/p&gt;</description></item></channel></rss>